Items where Division is "Fakultas Teknik > S1 Teknik Pertambangan > Laporan Tugas Akhir" and Year is 2025

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type | No Grouping
Jump to: Thesis
Number of items: 8.

Thesis

ARIAL, ARIAL (2025) ANALISIS KESTABILAN LERENG DESAIN DISPOSAL AREA NORTH DENGAN METODE MORGENSTERN PRICE DI PT. ADARO INDONESIA. undergraduate thesis, Universitas Muhammadiyah Mataram.

Abdul, Kadir (2025) ANALISIS PENCAPAIAN TARGET PRODUKSI OVERBURDEN BULAN NOVEMBER 2023 PADA PIT MIDDLEWEST DI PT CIPTA BERSAMA SUKSES. undergraduate thesis, Universitas Muhammadiyah Mataram.

KADAFI, KADAFI (2025) KAJIAN TEKNIS GEOMETRI PELEDAKAN MENGGUNAKAN METODE R.L. ASH DAN C.J. KONYA UNTUK PERBAIKAN FRAGMENTASI DI PIT JONGKANG PT. BUKIT BAIDURI ENERGI, TENGGARONG, KUTAI KARTANEGARA, KALIMANTAN TIMUR. undergraduate thesis, Universitas Muhammadiyah Mataram.

NANDA, ARI SAMUDRA (2025) ANALISIS KESTABILAN LERENG MENGGUNAKAN METODE KINEMATIK DAN KESETIMBANGAN BATAS (LIMIT EQUILIBRIUM) DI LERENG PIT MAIN RIDGE TENGAH PADA PT J RESOURCES BOLAANG MONGONDOW SITE BAKAN SULAWESI UTARA. undergraduate thesis, Universitas Muhammadiyah Mataram.

RIYADH, ADAM (2025) ANALISIS PENGARUH FRAGMENTASI BATUAN HASIL RIPPING TERHADAP PRODUKTIVITAS EXCAVATOR PADA KEGIATAN PENGUPASAN TANAH PENUTUP (OVERBURDEN) DI PIT K TENGAH PT. FAJAR ANUGERAH DINAMIKA SITE BERAU COAL. undergraduate thesis, Universitas Muhammadiyah Mataram.

SUDIRMAN, SUDIRMAN (2025) ANALISIS PENGARUH TINGGI MUKA AIR TANAH TERHADAP KESTABILAN LERENG WASTE DUMP PARTOLANG PADA PT.BATUTUA KHARISMA PERMAI KABUPATEN MALUKU BARAT DAYA DENGAN MENGGUNAKAN METODE MORGENSTERN-PRICE DAN FELLENIUS. undergraduate thesis, Universitas Muhammadiyah Mataram.

VERDY, APRISETIADI (2025) ANALISIS GEOMETRI PELEDAKAN MENGGUNAKAN METODE R.L. ASH DAN C.J. KONYA UNTUK MEMENUHI TARGET FRAGMENTASI DI PIT TAPAGALE PT. J RESOURCES BOLAANG MONGONDOW. undergraduate thesis, Universitas Muhammadiyah Mataram.

Y., M. FAUZAN (2025) ANALISIS DATA CURAH HUJAN UNTUK KEBUTUHAN POMPA DI AREA TONGOLOKA POND TAHUN 2024 PT. AMMAN MINERAL INTERNASIONAL TBK MENGGUNAKAN METODE THOMAS FIERING. undergraduate thesis, Universitas Muhammadiyah Mataram.

This list was generated on Sat Apr 19 17:08:47 2025 +08.