Items where Division is "Fakultas Teknik > S1 Teknik Pertambangan > Laporan Tugas Akhir" and Year is 2025
![]() | Up a level |
Number of items: 3.
A
ARIAL, ARIAL (2025) ANALISIS KESTABILAN LERENG DESAIN DISPOSAL AREA NORTH DENGAN METODE MORGENSTERN PRICE DI PT. ADARO INDONESIA. undergraduate thesis, Universitas Muhammadiyah Mataram.
Abdul, Kadir (2025) ANALISIS PENCAPAIAN TARGET PRODUKSI OVERBURDEN BULAN NOVEMBER 2023 PADA PIT MIDDLEWEST DI PT CIPTA BERSAMA SUKSES. undergraduate thesis, Universitas Muhammadiyah Mataram.
R
RIYADH, ADAM (2025) ANALISIS PENGARUH FRAGMENTASI BATUAN HASIL RIPPING TERHADAP PRODUKTIVITAS EXCAVATOR PADA KEGIATAN PENGUPASAN TANAH PENUTUP (OVERBURDEN) DI PIT K TENGAH PT. FAJAR ANUGERAH DINAMIKA SITE BERAU COAL. undergraduate thesis, Universitas Muhammadiyah Mataram.