Items where Division is "Fakultas Teknik > S1 Teknik Pertambangan > Laporan Tugas Akhir" and Year is 2026

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type | No Grouping
Jump to: A | B | D | E | H | I | K | L | M | N | R | S | T
Number of items: 28.

A

ADYAN, ADIB DEWANTARA (2026) ANALISIS DEGRADASI NILAI KALORI BATUBARA BERDASARKAN PENGARUH SERTA HUBUNGAN KADAR AIR (TOTAL MOISTURE) DAN KADAR ABU (ASH CONTENT) PADA AREA PIT 6 HINGGA AREA RUN OF MINE (ROM) MENGGUNAKAN REGRESI LINEAR BERGANDA PADA PT. LAMINDO INTER INTER MULTIKON. undergraduate thesis, Universitas Muhammadiyah Mataram.

AHMAD, FAISAL (2026) ANALISIS PRODUKTIVITAS ALAT ANGKUT MENGGUNAKAN METODE TIME MOTION STUDY UNTUK MENCAPAI TARGET PENGIRIMAN MATERIAL SPENT ORE PADA BULAN DESEMBER 2023 DI PT. BATUTUA KHARISMA PERMAI. undergraduate thesis, Universitas Muhammadiyah Mataram.

AHMAD, NAUFAL (2026) OPTIMALISASI KINERJA PEMOMPAAN PADA SUMP RIAM KANAN PIT CENTRAL PT. VE JOB SITE ADM, KECAMATAN MURUNG PUDAK, KABUPATEN TABALONG, KALIMANTAN SELATAN. undergraduate thesis, Universitas Muhammadiyah Mataram.

ANDIKA, DARMANSYAH (2026) ESTIMASI CADANGAN ANDESIT BAWAH PERMUKAAN MENGGUNAKAN METODE GEOLISTRIK 1D KONFIGURASI SCHLUMBERGER DI DESA TAMAN AYU, KECAMATAN GERUNG, KABUPATEN LOMBOK BARAT. undergraduate thesis, Universitas Muhammadiyah Mataram.

ARI, ARYANSYAH (2026) ANALISIS MINE DRAINASE DI AREA PIT 5 PADA PT. BATURONA ADIMULYA SUMATRA SELATAN. undergraduate thesis, Universitas Muhammadiyah Mataram.

B

BAIQ, DEWI HAERANTI (2026) OPTIMASI KESERASIAN ALAT GALI MUAT DAN ANGKUT DALAM MENINGKATKAN TARGET PRODUKSI PADA PIT MAIN RIDGE PT. J RESOURCES BOLAANG MONGONDOW SITE BAKAN SULAWESI UTARA. undergraduate thesis, Universitas Muhammadiyah Mataram.

D

DIDAT, SANJAYA (2026) KAJIAN TEKNIS PENERAPAN GEOMETRI PELEDAKAN UNTUK MENCAPAI TARGET FRAGMENTASI DAN DIGGING TIME YANG OPTIMAL PADA KEGIATAN PEMBERAIAN MATERIAL WASTE DI PIT BATU HIJAU AREA SOUTH WEST OLAT BALAT PT AMMAN MINERAL. undergraduate thesis, Universitas Muhammadiyah Mataram.

DIMAS, AJI SAJIWO (2026) ANALISIS STABILITAS LERENG PENGERJAAN PENUTUPAN KOLAM 2 PADA AREA SPBT 14 PANEL 2 DI PT BUKIT MAKMUR MANDIRI UTAMA SITE IPR KALIMANTAN TIMUR. undergraduate thesis, Universitas Muhammadiyah Mataram.

DIRJAN, ADI PRASUJU (2026) ANALISIS GEOMETRI PELEDAKAN BERDASARKAN METODE R.L. ASH DAN C.J. KONYA UNTUK MENCAPAI TARGET FRAGMENTASI DI PIT JALINA PT J RESOURCES BOLAANG MONGONDOW. undergraduate thesis, Universitas Muhammadiyah Mataram.

E

EKA, YUDIARTA (2026) OPTIMASI KINERJA ALAT GALI MUAT DAN ALAT ANGKUT PADA KEGIATAN PENAMBANGAN EMAS DI PT J RESOURCES BOLAANG MONGONDOW SITE BAKAN SULAWESI UTARA. undergraduate thesis, Universitas Muhammadiyah Mataram.

EKI, PARATAMA (2026) OPTIMALISASI PRODUKTIVITAS ALAT GALI MUAT & ALAT ANGKUT PADA PENGUPASAN MATERIAL OVERBURDEN DI PIT 4 PT. BINASARANA SUKSES JOBSITE PT. BATURONA ADIMULYA KABUPATEN MUSI BANYUASIN PROVINSI SUMATERA SELATAN. undergraduate thesis, Universitas Muhammadiyah Mataram.

H

HASINAH, HASINAH (2026) ANALISIS KUALITAS BATUBARA DI PIT DAN STOCKPILE DENGAN METODA ANALISIS PROKSIMAT DI PT. BUMI ALAM RAYA PROVINSI KALIMANTAN TIMUR. undergraduate thesis, Universitas Muhammadiyah Mataram.

I

ILMAN, HASANDI (2026) ANALISIS KESTABILAN LERENG TAMBANG BATUBARA PIT ABIMANYU PT PUTRA MUBA COAL KECAMATAN SUNGAI LILIN KABUPATEN MUSI BANYUASIN PROVINSI SUMATERA SELATANANALISIS KESTABILAN LERENG TAMBANG BATUBARA PIT ABIMANYU PT PUTRA MUBA COAL KECAMATAN SUNGAI LILIN KABUPATEN MUSI BANYUASIN PROVINSI SUMATERA SELATAN. undergraduate thesis, Universitas Muhammadiyah Mataram.

IMAM, RIZKILLAH (2026) ANALISIS SISTEM MINE DRAINAGE PADA AREA STOCKPILE EFO DI JETTY PT. INDRABAKTI MUSTIKA KABUPATEN KONAWE UTARA PROVINSI SULAWESI TENGGARA. undergraduate thesis, Universitas Muhammadiyah Mataram.

K

KAMELIA, WARDINI (2026) ANALISIS KESTABILAN LERENG PADA AREA IN PIT DUMP DISPOSAL ABIMANYU MENGGUNAKAN METODE MORGENSTERN PRICE PT. PUTRA MUBA COAL PROVINSI SUMATRA SELATAN. undergraduate thesis, Universitas Muhammadiyah Mataram.

L

LILIS, TRIANI (2026) ANALISIS BLENDING BAUKSIT PADA TONGKANG MARINE POWER 2706 MENGGUNAKAN METODE SIMPLEK UNTUK PEMENUHAN KADAR KUALITAS DAN TONASE PADA PT. BUMI KHATULISTIWA BAUKSIT KALIMANTAN BARAT. undergraduate thesis, Universitas Muhammadiyah Mataram.

M

M. SAIUN, AKBAR (2026) ANALISIS PENGARUH METODE SAMPLING TERHADAP KUALITAS DAN REPRESENTATIVITAS SAMPEL PRODUKSI BIJIH NIKEL DI PT INDRABAKTI MUSTIKA KABUPATEN KONAWE UTARA SULAWESI TENGGARA. undergraduate thesis, Universitas Muhammadiyah Mataram.

MITA, WIRA MADANIA (2026) ANALISIS KESERASIAN ALAT GALI MUAT DAN ANGKUT PADA KEGIATAN OVERBURDEN REMOVAL UCOAL RESOURCES JOBSITE PT. BATURONA ADIMULYA. undergraduate thesis, Universitas Muhammadiyah Mataram.

MUHAMMAD, ERGIAWAN (2026) PERHITUNGAN VOLUME CADANGAN BATUBARA DAN STRIPPING RATIO BERDASARKAN DESAIN PIT PT. TAMBANG BUKIT TAMBI SITE PADANG KELAPO, DESA PADANG KELAPO, KECAMATAN MARO SEBOULU, KABUPATEN BATANG HARI, PROVINSI JAMBI. undergraduate thesis, Universitas Muhammadiyah Mataram.

MUHAMMAD, RIZQY AL FAJAR (2026) ANALISIS KUALITAS BATUBARA DENGAN METODE PROKSIMAT PADA AREA PENAMBANGAN (PIT), ROM, DAN STOCKPILE SESUAI STANDAR PERUSAHAAN PT. LAMINDO INTER MULTIKON. undergraduate thesis, Universitas Muhammadiyah Mataram.

N

NURHIDAYAH, NURHIDAYAH (2026) OPTIMASI JUMLAH FLEET ALAT GALI MUAT DAN ALAT ANGKUT MENGGUNAKAN METODE FLEET BALANCE UNTUK MENINGKATKAN PRODUKTIVITAS OVERBURDEN DI PIT A1 C PT. ASTAKA DODOL KABUPATEN MUSI BANYUASIN SUMETARA SELATAN. undergraduate thesis, Universitas Muhammadiyah Mataram.

NURINAYA, NURINAYA (2026) ANALISIS PROKSIMAT BATUBARA UNTUK MENENTUKAN KANDUNGAN ABU (ASH) DAN PENGARUHNYA TERHADAP KUALITAS DI PT. BATURONA ADIMULYA PADA AREA PIT 4, SUMATRA SELATAN. undergraduate thesis, Universitas Muhammadiyah Mataram.

NURRAHMAH, NURRAHMAH (2026) KAJIAN TEKNIS SISTEM DEWATERING TAMBANG BATUBARA BERDASARKAN ANALISIS KAPASITAS SUMP DAN KINEJA POMPA PADA PIT MIDDLE PT. BUKIT MAKMUR MANDIRI UTAMA SITE IBP. undergraduate thesis, Universitas Muhammadiyah Mataram.

R

RATNA, PERMATASARI (2026) ANALISIS PRODUKTIVITAS ALAT GALI-MUAT DAN ALAT ANGKUT DENGAN METODE TIME MOTION STUDY UNTUK MENCAPAI TARGET PRODUKSI BIJIH PT.INDRABAKTI MUSTIKA KABUPATEN KONAWE UTARA PROVINSI SULAWESI TENGGARA. undergraduate thesis, Universitas Muhammadiyah Mataram.

RIZKI, CAHYADI (2026) ANALISIS PRODUKSI BACKHOE EXCAVATOR PADA PENGUPASAN OVERBURDEN DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS DI PIT SP 4 WARA PT. CBML JOB SITE ADM, KECAMATAN TANJUNG, KABUPATEN TABALONG, KALIMANTAN SELATAN. undergraduate thesis, Universitas Muhammadiyah Mataram.

S

SUFIAN DANDI, ARIADI (2026) IDENTIFIKASI BATUAN ANDESIT BAWAH PERMUKAAN DENGAN MENGGUKAN METODE GEOLISTRIK KONFIGURASI WENNER-SCHLUMBERGER DI DAERAH PRINGGABAYA LOMBOK TIMUR. undergraduate thesis, Universitas Muhammadiyah Mataram.

SYAHRULLAH, SYAHRULLAH (2026) OPTIMASI JUMLAH FLEET ALAT GALI-MUAT DAN ALAT ANGKUT MENGGUNAKAN METODE FLEET BALANCE PADA PENGANGKUTAN BATUBARA DI PT. SAKA PUTRA PERKASA SITE BUNYU BARAT, KECAMATAN BUNYU, KABUPATEN BULUNGAN, KALIMANTAN UTARA. undergraduate thesis, Universitas Muhammadiyah Mataram.

T

TAOPAN, HIDAYAT (2026) PERENCANAAN GEOMETRI SUMP DI PIT 1 SELATAN JOB SITE BUNYU PT. SAKA PUTRA PERKASA UNTUK MENDUKUNG SISTEM PENYALIRAN TAMBANG. undergraduate thesis, Universitas Muhammadiyah Mataram.

This list was generated on Fri Aug 28 05:53:01 2026 +08.